Pre-construction preparation for a deep well water supply project is often compressed into an equipment list: the drilling rig is in place, the air compressor is in place, and the drilling tools are in place, and then work can start. But in actual progress, problems often arise outside the list—space needed for raising the mast has not been reserved, the air compressor displacement does not match the hole diameter and depth, there is no hole stabilization plan for the upper loose layer, and the well casing and screen for well completion have not been decided. These matters are scattered across different processes and can only be arranged as check items in the order of drilling commencement to avoid omissions.
Below, according to the three stages of "before drilling—during drilling—before well completion," the capabilities and supporting requirements in the public information on RC500E are matched item by item to specific processes.
Before drilling: site, transportation, and overall machine condition
This stage addresses whether the equipment can smoothly enter the site, raise the mast, and be positioned. The RC500E has an overall weight of about 12 T, a crawler travel speed of about 2.5 km/h, and a reference climbing ability of 30°. The transport dimensions are about 6300×2100×2500 mm, and the working dimensions are about 4000×2900×6800 mm. The check items corresponding to these data are:
- Whether the bearing capacity and width of the access road can meet the passage of crawler travel and transport vehicles; movement should be cautious in soft soil and wet slippery areas;
- Whether the load capacity and fixing points of the transport vehicle match the overall machine of about 12 T, and whether height restrictions along the route affect transportation;
- Whether the working space and safe operating range required for raising the mast are reserved around the hole position.
At the same time, routine checks before daily work should cover high-pressure air hoses, joints, safety ropes, rotary heads, crawlers, mast, and hydraulic system. This machine uses 132 kW diesel power with a rated speed of 2400 r/min. It has better independent operation capability when remote sites lack a stable power supply, but long-term high-load operation requires attention to engine cooling, air filtration, and the fuel system. This part corresponds to power guarantee, not drilling capability itself.

Air supply and drilling tools: determine support according to hole depth, hole diameter, and formation
Air-lift reverse circulation relies on compressed air to establish reverse flow in the inner pipe, carrying rock cuttings from the hole bottom back to the surface along the inside of the drill pipe. The RC500E recommends a working air pressure of 1.7–3.5 MPa and an air consumption of 17–42 m³/min. When hole depth increases, hole diameter becomes larger, rock layers become harder, or construction altitude rises, the required displacement will increase. Therefore, the air supply check before drilling is not just "whether the air compressor has arrived," but:
- Whether the exhaust volume of the proposed air compressor can cover the cuttings return demand under the planned hole diameter and depth;
- Whether the down-the-hole hammer and reverse circulation cuttings return share the same air supply conditions;
- Whether accessories such as high-pressure air hoses and oil misters are provided according to the requirements of the pneumatic system.
Regarding drilling tools, this machine has a drilling diameter of 140–400 mm, a maximum drilling depth of 500 m, can be equipped with a 3.3 m or 6.6 m feed stroke, and supports 1.5/2/3/6 m drill pipes. The selection of feed stroke and drill pipe length should be determined together with transportation conditions, hole position space, and the main drill pipe length, and should not be decided only by the single direction of "fewer pipe connections."
Formation changes: prepare separately for upper overburden and hard rock sections
The in-hole process of deep well water supply is usually handled in two sections. The difficulty of weathered rock and upper loose overburden lies in hole wall stability. The information suggests first using casing, mud, or other hole stabilization methods to establish a stable hole section, and then entering relatively intact rock layers for pneumatic reverse circulation drilling. After entering relatively intact rock layers such as granite, basalt, and limestone, the down-the-hole hammer impact, rotation speed, feed force, and air volume need to be coordinated and matched; if cuttings removal is poor, continuing to increase advancement may aggravate drill bit wear and sticking risk.

Faults, fractured zones, and open fissure formations bring another type of problem: block falling, hole shrinkage, air leakage, and sticking. The treatment direction given in the information is to reduce advancement speed, maintain continuous hole cleaning, and use casing or foam assistance according to hole wall stability. When air leakage is severe, merely increasing pressure while displacement is insufficient may still fail to provide effective airflow at the hole bottom, so it needs to be handled from both displacement and process aspects. These are dynamic judgments during drilling. What can be done before commencement is to incorporate casing, foam system, and other support into the plan, rather than supplementing them after problems arise.
Before well completion: aquifer records and well casing and screen preparation
After the borehole enters the main aquifer, groundwater will change the cuttings return and down-the-hole hammer working state in the hole. At this step, record the depth of the main water-producing layers and adjust air supply, hole cleaning, and casing methods according to water inflow. At the well completion stage, arrange screens and water-stop sections according to the aquifer position to ensure long-term pumping effect. The 140–400 mm hole diameter range allows different well diameters to be designed according to well casing size, submersible pump, and expected water output, but the final well depth should still be determined by hydrogeological data and the actual water-producing layers. Equipment capability only provides depth margin and does not replace water-finding judgment.
Regarding lifting and rotation, 300 kN lifting force, 150 kN feed force, and 8000–12000 N·m rotation torque provide operating margin for tripping, casing handling, and drilling in hard rock sections. When abnormal resistance is encountered, the hole should be cleaned first and the in-hole condition judged; it is not advisable to directly use maximum lifting force to pull forcefully.

Supporting equipment and matters to be confirmed
A complete construction system also requires optional selection according to the project of reverse circulation DTH hammers, drill bits, drill pipes of different specifications, casing tools, air compressors, high-pressure air hoses, oil misters, foam pumps, and generators, etc.; not all need to be equipped. The 20 kN auxiliary winch can be used for handling down-the-hole hammers, drill pipes, and casing tools, and the rated load should be controlled during use.
The following matters have not been concluded in the information and need to be confirmed separately at the project level: the actual drillability of specific formations, the final water-producing layer position corresponding to the planned well depth, local requirements for well completion materials and water-stop processes, and the actual matching parameters of the air compressor and down-the-hole hammer. If these conditions are not implemented, equipment parameters alone cannot determine whether the project can achieve the expected well completion.